Step 2: Meet With the Staking Technician

The next step is to meet with our Staking Technician at the building site to review the service's installation options.

Before scheduling this meeting, the following must be completed:

  1. All buildings must be staked.
  2. The driveway must be marked.
  3. The locations of the septic/leech field and well must be approved by the governing county (and preferably staked).

During this meeting, the Technician will provide you with options and a final site plan that shows how the service should be installed, an upfront cost contribution-in-aid-of-construction quote (if applicable), a checklist for installation of your service, spec drawings, and instructions on how to proceed if any further steps need to be completed.

Please bring a copy of the deed or survey to this meeting.